September 22, 2026 | Monclova, OH
Mitigation work was performed in the basement. Unaffected areas around the work zone and throughout the residence were protected to prevent damage or contamination. Access and protection measures were coordinated via the garage. The affected basement area was prepared for mitigation and restoration, with the work zone isolated and surrounding ...
September 22, 2026 | Toledo, OH
The restoration team conducted an initial inspection and documented the extent of the fire loss, including moisture and soot conditions, using photo and video. Damaged materials and affected contents were removed, and soot-affected surfaces were cleaned. Antimicrobial and cleaning treatments were applied where necessary. Air filtration and drying equipment were ...
September 21, 2026 | Oregon, OH
Performed comprehensive sewage damage cleanup in the crawl space, including removal of contaminated vapor barrier and accumulated debris. All affected areas were thoroughly cleaned, sprayed, and disinfected to address contaminated surfaces and reduce microbial growth risks. Lime was spread throughout the crawl space for stabilization. Following inspection, damp soil was ...
September 16, 2026 | Perrysburg, OH
Our technician performed initial moisture mapping and atmospheric readings to assess the extent of the water intrusion. We deployed specialized drying equipment to thoroughly mitigate the affected drywall and flooring, closely monitoring atmospheric readings and drying progress throughout the project. Once dry goals were successfully reached, all structural drying equipment ...
August 31, 2026 | Oregon, OH
The restoration team established containment and protected contents using plastic sheeting. They extracted water from the affected flooring, removed approximately 75 linear feet of base trim, and demolished damaged wood paneling and drywall. A five-foot section of wet drywall and discolored Styrofoam insulation were removed from the laundry room. All affected ...
August 26, 2026 | Lambertville, MI
The restoration team established protective drop cloths from the doorway to the crawlspace entrances, contained the access points, and pumped out the sewage. The crawlspace was then flushed with clean water to remove remaining sewage residue before lime was applied to the affected area. An antimicrobial treatment was also applied ...
August 26, 2026 | Sylvania, OH
The affected materials were inspected to determine the extent of moisture intrusion and deterioration. Damaged carpet and flooring were removed as necessary. Affected sections of drywall were opened or removed to address hidden moisture and prevent further damage, exposing wall studs and subfloor for drying and remediation.
August 25, 2026 | Saline, MI
The restoration team performed atmospheric and moisture readings throughout the affected areas to monitor drying conditions and verify the moisture levels of the structural materials. Upon inspection, the wood sill plates were found to be dry, indicating that the affected materials had reached acceptable drying standards. All remaining drying equipment ...
August 24, 2026 | Toledo, OH
The restoration technicians assessed the affected areas, removed damaged and unsalvageable materials as necessary, and addressed the affected flooring, insulation, and other building materials. The areas were cleaned and treated as needed, while drying equipment was placed throughout the property to promote moisture removal. Moisture levels were monitored during the ...
August 22, 2026 | Monclova, OH
The affected surfaces were cleaned by removing visible sewage and wastewater using mopping and wiping with rags. An antimicrobial treatment was applied to the contaminated areas. Affected drywall was cut 6 inches high to facilitate remediation. Two air scrubbers were placed in the affected area and an outside area to assist ...
August 21, 2026 | Curtice, OH
Cousino Restoration technicians meticulously inspected the affected areas, documented the damage, and carefully exposed areas where moisture might have been trapped. Damaged or compromised materials were removed as required, with thorough evaluation of exposed framing and surrounding surfaces for moisture content. A temporary containment barrier was installed at the doorway ...
Total: 198